Quezon produced 28,055 metric tons of corn during the fourth quarter of 2019. It remains as the top producer of corn in CALABARZON region accounting for 62.6 percent of the region’s total production of 44,796 metric tons. Batangas followed with 11,…
Quezon was the second top palay producing province in CALABARZON in the third quarter of 2019. It produced 9,217 metric tons of palay comprising 29.0 percent of the total regional output of 31,837 metric tons. Laguna was the top palay producer in…
Quezon was the second top palay producing province in CALABARZON in the second quarter of 2019. It produced 44,771 metric tons of palay comprising 35.9 percent of the total regional output of 124,857 metric tons. Laguna was the top palay producer in…
Quezon was the top palay producing province in CALABARZON in the first quarter of 2019. It produced 38,203 metric tons of palay comprising 45.5 percent of the total regional output of 83,942 metric tons. Laguna came next with 28.1 percent share (23,…
This special release presents data on registered births, deaths and marriages by sex and city/municipality in the Province of Cavite occurring in December 2019.
This special release presents data on registered births, deaths and marriages by sex and city/municipality in the Province of Cavite occurring in November 2019.
The Consumer Price Index (CPI) in Quezon province for the month of December 2019 was posted at 124.3 index points. The CPI increased by 4.0 index points from last year’s figure of 120.3.
The total number of constructions in the third quarter of 2019 reached 1,937, based on the preliminary results of construction statistics from approved building permits.
The average Consumer Price Index (CPI) in Quezon for the year 2019 was estimated at 121.7 index points, higher by 2.0 index points from its year ago figure of 119.7.
A construction permit or building permit is a permit required in most jurisdictions for new construction, or adding onto pre-existing structures, and in some cases for major renovations. Generally, the new construction must be inspected during…
Filing Period for positions to be assigned in NCR: 15-25 January 2020 8:00 AM to 5:00 PM (except Sundays and Holidays) For positions to be assigned at the RSSO/PSO of Regions III and IV-A: 15-25 January 2020 8:00 AM to 5:00 PM (except Sundays and…
This report presents the Consumer Price Index (CPI), Inflation Rate (IR) and Purchasing Power of Peso (PPP) for all income households in the province of Cavite during the month of November 2019.
This report presents the Consumer Price Index (CPI), Inflation Rate (IR) and Purchasing Power of Peso (PPP) for all income households in the province of Cavite during the month of December 2019.
In Sto. Tomas harvesting of the following crops was noted: about 600 kilograms of papaya green in Bgry. San Vicente, Sto. Tomas, 3,500 kilograms of tomato in Brgy Sta. Teresita and around 7,500 pieces of Pineapple in Brgy. San Francisco.